Road and Track Vehicles
SWIFT 50 GLP Sensors Installation Installing the Transducer
35
6. Tighten the M10 mounting bolts.
A. Following the sequence shown in the previous figure, torque the eight
M10 bolts (A through H) to the value for the first increment shown in
the following table.
B. Repeat Step 6A for the second increment.
C. Repeat Step 6A for the final torque.
7. Tighten the M16 mounting bolts.
A. Following the sequence shown in the previous figure, torque the
sixteen M16 bolts (1 through 16) to the value for the first increment
shown in the following table.
B. Repeat Step 7A for the second increment.
C. Repeat Step 7A for the final torque.
Note To minimize negative clamping effects, you must torque the bolts in the
sequence shown.
Bolt Size
Torque Increment M10 M16
1st Increment
24 N•m (18 lbf•ft) 108 N•m (80 lbf•ft)
2nd Increment
48 N•m (36 lbf•ft) 317 N•m (160 lbf•ft)
Final Torque
74 N•m (55 lbf•ft) 325 N•m (240 lbf•ft)