MTS Acumen™ Electrodynamic Test System
Test Area Enclosure Installation Guide
100-265-243 A be certain.
Przeglądanie stron 0
1 2 3 4 5 6 ... 17 18

Podsumowanie treści

Strona 1 - 100-265-243 A be certain

MTS Acumen™ Electrodynamic Test SystemTest Area Enclosure Installation Guide100-265-243 A be certain.

Strona 2

20. Align the front door latch.a) Loosen the top and bottom M4 flathead screws located inside the door latch vertical edge.b) Adjust the latch so that

Strona 3 - Contents

Test Area EnclosureDescriptionItemRear panel assembly1M6 x 1 mm x 35 mm socket low head screw2Top bracket3M6 x 1.00 mm x 12 mm buttonhead cap screw4M6

Strona 4

4. Put M5 C'Bore butt fasteners (item 9) in the two bottom slots in the side panel and insert the DIN912 M5x 0.80 mm x 30 mm SST sockethead cap s

Strona 5

20. Route and secure the safety switch sensor cable.MTS Acumen™ Electrodynamic Test System 13Test Area Enclosure Installation

Strona 6 - (Right-Hand Opening)

a) Place the loop clamps onto the sensor cable, and position the clamps near the provided threadedmounting holes on the vertical side edge and bottom

Strona 7

Torque GuidelinesTorque toItem11 N-m (8.2 lb-ft)A10 N-m (7.3 lb-ft)B12 N-m (8.8 lb-ft)C6.5 N-m (4.8 lb-ft)D26. Align the front door latch.MTS Acumen™

Strona 8

a) Loosen the top and bottom M4 flathead screws located inside the door latch vertical edge.b) Adjust the latch so that the upper and lower catch ball

Strona 9

100-265-243 A

Strona 11

© 2012 MTS Systems Corporation. All rights reserved.Trademark InformationMTS is a registered trademark and MTS Acumen is a trademark of MTS Systems Co

Strona 12

ContentsTest Area Enclosure Installation 5About Installing Optional Enclosures...

Strona 14

Test Area Enclosure InstallationTopics:•About Installing Optional Enclosures...

Strona 15

About Installing Optional EnclosuresThe customer must evaluate risks due to ejected parts or materials from the test specimens. If test area guardis n

Strona 16

DescriptionItemFoot mount7M5 X 35MM socket head screw, M5 butt fastener8M5 C'Bore butt fastener9Foot mount10Right side panel assembly11Front door

Strona 17 - 100-265-243 A

14. It makes installation easier to route and secure the safety switch sensor cable prior to mounting the sidepanel.a) Place loop clamps over the sens

Strona 18

g) Loop the cable down and back. Plug it into the enclosure switch connector.In most cases where the test area enclosure is installed after frame inst